1.Hull and piping repairing with WPS, welder approved by ABS, CCS, DNV, LR.
2.Ballast tanks hydro-ballast and coating upgrading to accommodate the MSC. 525(106)
‘WBT excluding double bottom if less than GOOD Coating condition, to be upgraded or annual internal inspection+/UTM. And the same for void space to double side skin bulk carrier if exceeding 20 years and of 150m in length and upwards effective from 2024-07-01’
3.Heat exchange cleaning, overhauling and assembling.
4.Hydraulic device inspection and repairing.
5.Hatch Cover, watertight door, ramp door inspection and repairing
6.Insulation material and anti-splash taps dress up
7.Cable routing research, laying and connection with electronic device.
8.UTM, FFE, LSA, Radio, VDR service and repairing
9.Engine turbine, governor, engine overhauling and inspection
10.Pre-PSC inspection, on/off-hire inspection, ship visit